İnşaat
Perşembe, 28 Mart 2024

Turkish Garanti Bank A.S.

 

Turkish Garanti Bank A.S. Multistoried Car Park and Extention Service Building - Istanbul/Turkey

 

First we have completed 10.500 m2 closed area multistoried carpark building. Then, performed concreting works of 25 storied extension service building of which fist three floors were 3.000 m2 and remaining 22 floors were 1.140 m2 each, totaling 34.000 m2. We have performed all foundation and concreting works of the building. Some of the construction materials were supplied by the client including ready concrete and steel.

 

İnşaat, Makina & Elektrik Mühendisliği


İlk operasyonlarımız inşaat projelerinin yurt dışındaki uygulamalarıyla başladı. Bu güne kadar Libya, Irak, Suudi Arabistan, CIS ülkeleri (Türkmenistan, Özbekistan) ve Rusya Federasyonunda pek çok proje tamamlanmıştır. Operasyon türlerimiz:

İnşaat, Makina & Elektrik Mühendisliği


İlk operasyonlarımız inşaat projelerinin yurt dışındaki uygulamalarıyla başladı. Bu güne kadar Libya, Irak, Suudi Arabistan, CIS ülkeleri (Türkmenistan, Özbekistan) ve Rusya Federasyonunda pek çok proje tamamlanmıştır. Operasyon türlerimiz:

  • Building (Headquarters) Construction

    1.800 m2 Building was handed over only with concrete and roofing works finished...

  • Hospital Construction

    Complete renovation of a 24.000 m2, existing building into a 400-bed hospital (5 operating theatre), including civil, HVAC and electrical works...

  • Hotel Complex

    Hotel complex project includes design, land survey and execution as well as equipment and partial furnishing...

  • Silo Building Repair

    Renovation of an existing silo building in Corum Cement Factory which was damaged by earthquake...

  • Uliuk Spinning Factory Construction

    Civil, mechanical and electrical works of a 8.000 m2 spinning factory...

  • Underground Gallery Construction

    900 m long, 5mx5m gallery construction...

  • Tashkent Dedeman

    We have performed part of finishing works as well as furniture supply for the Dedeman and Boghchul Hotels...

  • Yumurtalik Housing Complex

    We have performed part of concreting and finishing works of 15 separate 2 to 4 storied buildings having 4 flats at every story and totaling 72 flats in either 90 m2 or 120 m2 each...

  • Water Pipeline Major Repairs

    The project owned by Ministry of Agriculture and Water Resources in Uzbekistan...

TEXT_SIZE